Abstract
We address the three-machine flowshop scheduling problem to minimise maximum lateness, where setup times are considered separate from processing times. We establish a dominance relation for the problem where it specifies which of the two adjacent jobs should precede in an optimal solution. Moreover, we propose three heuristics: Earliest Due Date (EDD), an Enhanced Earliest Due Date (EEDD) and a Polynomial Genetic-based Algorithm (PGA). We conduct computational analysis on randomly generated problems to evaluate the performance of the proposed heuristics. The analysis shows that the performance of EEDD is acceptable if the computational time is of the main concern and the number of jobs are large. The analysis also shows that PGA significantly outperforms EDD and EEDD.
Original language | English |
---|---|
Pages (from-to) | 135-155 |
Number of pages | 21 |
Journal | International Journal of Operational Research |
Volume | 2 |
Issue number | 2 |
DOIs | |
Publication status | Published - 12 Apr 2007 |
Keywords
- Dominance relation
- Flowshop
- Heuristics
- Maximum lateness
- Scheduling
ASJC Scopus subject areas
- Management Science and Operations Research