Supporting pre-tender construction planning with virtual prototyping

Andrew Baldwin, Heng Li, Ting Huang, C. W. Kong, H. L. Guo, Neo Chan, Johnny Wong

Research output: Journal article publicationJournal articleAcademic researchpeer-review

9 Citations (Scopus)

Abstract

Purpose - Virtual prototyping technologies linked to building information models are commonplace within the aeronautical and automotive industries. Their use within the construction industry is now emerging. The purpose of this paper is to show how these technologies have been adopted on the pre-tender planning for a typical construction project. Design/methodology/approach - The research methodology taken was an "action research" approach where the researchers and developers were actively involved in the production of the virtual prototypes on behalf of the contractor thereby gaining consistent access to the decisions of the planning staff. The experiences from the case study were considered together with similar research on other construction projects. Findings - The findings from the case studies identify the role of virtual prototyping in components modelling, site modelling, construction equipment modelling, temporary works modelling, construction method visualization and method verification processes. Originality/value - The paper presents a state-of-the-art review and discusses the implications for the tendering process as these technologies are adopted. The adoption of the technologies will lead to new protocols and changes in the procurement of buildings and infrastructure. Construction operations Modelling Prototypes Simulation Tendering.
Original languageEnglish
Pages (from-to)150-161
Number of pages12
JournalEngineering, Construction and Architectural Management
Volume16
Issue number2
DOIs
Publication statusPublished - 27 Feb 2009

Keywords

  • Construction operations
  • Modelling
  • Prototypes
  • Simulation
  • Tendering

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Architecture
  • Building and Construction
  • General Business,Management and Accounting

Fingerprint

Dive into the research topics of 'Supporting pre-tender construction planning with virtual prototyping'. Together they form a unique fingerprint.

Cite this