Abstract
The technical-economic view is first adopted to identify the best construction method according to project management objective under certain condition based on value engineering (VE) and function analysis system technique (FAST). Then an appraising model is set up, with expert knowledge and group decision techniques. Finally, the Kuigang tunnel is discussed, which shows that this model is effective for construction scheme optimization and has the value for further study.
Original language | Chinese (Simplified) |
---|---|
Pages (from-to) | 2669-2677 |
Number of pages | 9 |
Journal | Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering |
Volume | 26 |
Issue number | SUPPL. 1 |
Publication status | Published - 1 Jul 2007 |
Keywords
- Construction scheme optimization
- Cost
- Function analysis system technique (FAST)
- Group decision support system (GDSS)
- Kuigang tunnel
- Tunnelling engineering
- Value engineering (VE)
ASJC Scopus subject areas
- Civil and Structural Engineering
- Geotechnical Engineering and Engineering Geology
- Geology