Abstract
Results of a survey indicate that 89% of the respondents use PC-based software packages to size their air-conditioning plant; 67% of them care about the building energy use; 83% adopt either ASHRAE standards or CIBSE guides in their design work; 67% intentionally oversize; and 87% use central air-conditioning plant with primary air fan-coil (PAF) systems in their recently completed commercial building projects.
| Original language | English |
|---|---|
| Pages (from-to) | 91-103 |
| Number of pages | 13 |
| Journal | Applied Energy |
| Volume | 66 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - 1 Jan 2000 |
ASJC Scopus subject areas
- Building and Construction
- General Energy
- Mechanical Engineering
- Management, Monitoring, Policy and Law
Fingerprint
Dive into the research topics of 'Sizing of air-conditioning plant for commercial buildings in Hong Kong'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver