Abstract
Due-window assignment and scheduling are important issues in modern manufacturing management. In this note we consider single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. The objective is to find jointly the optimal time to perform maintenance, the optimal location and size of the due-window, and the optimal job sequence to minimize the total earliness, tardiness, and due-window related costs. We show that the problem can be optimally solved in O (n4) time. We also show that a special case of the problem can be optimally solved by a lower order algorithm.
Original language | English |
---|---|
Pages (from-to) | 1510-1514 |
Number of pages | 5 |
Journal | Computers and Operations Research |
Volume | 37 |
Issue number | 8 |
DOIs | |
Publication status | Published - 1 Aug 2010 |
Keywords
- Aging effect
- Deteriorating maintenance
- Due-window assignment
- Scheduling
ASJC Scopus subject areas
- Computer Science(all)
- Modelling and Simulation
- Management Science and Operations Research