Abstract
We consider a single machine due date assignment scheduling problem with job-dependent aging effects and a deteriorating maintenance activity, where due dates are assigned using the SLK due date determination method. We need to make a decision on when to schedule the deteriorating maintenance activity, the optimal common flow allowance and the sequence of jobs to minimize total earliness, tardiness and common flow allowance cost. We show that the problem remains polynomially solvable under the proposed model.
Original language | English |
---|---|
Pages (from-to) | 1389-1400 |
Number of pages | 12 |
Journal | Optimization Letters |
Volume | 8 |
Issue number | 4 |
DOIs | |
Publication status | Published - 1 Jan 2014 |
Keywords
- Aging effect
- Deteriorating maintenance
- Scheduling
- Single machine
- SLK due date assignment
ASJC Scopus subject areas
- Control and Optimization