Scheduling with resource‐dependent release dates—a comparison of two different resource consumption functions

Chung Lun Li

Research output: Journal article publicationJournal articleAcademic researchpeer-review

13 Citations (Scopus)

Abstract

We consider the problem of scheduling a set of jobs on a single machine where the release time of a job is related to the amount of resource consumed. The objective is to minimize the total resource consumption with a control on the completion times of the jobs. Four different variants of the problem are studied: (i) minimization of the total resource consumption subject to a common deadline for all jobs, (ii) minimization of the total resource consumption subject to a constraint on the total completion time of the jobs, (iii) minimization of the weighted total resource consumption and maximum job completion time, and (iv) minimization of the weighted total resource consumption and the total job completion time. We compare the common resource consumption function with the function where the resource consumed is proportional to the processing time of the job. We show that these two different resource consumption functions can give rise to very different solution methods and different computational complexities for the problem.
Original languageEnglish
Pages (from-to)807-819
Number of pages13
JournalNaval Research Logistics (NRL)
Volume41
Issue number6
DOIs
Publication statusPublished - 1 Jan 1994
Externally publishedYes

ASJC Scopus subject areas

  • Modelling and Simulation
  • Ocean Engineering
  • Management Science and Operations Research

Fingerprint

Dive into the research topics of 'Scheduling with resource‐dependent release dates—a comparison of two different resource consumption functions'. Together they form a unique fingerprint.

Cite this