Schedule risk modeling in prefabrication housing production

Clyde Zhengdao Li, Qiping Shen, Fan Xue, Lizi Luo, Xiaoxiao Xu, Lucila Sommer

Research output: Journal article publicationJournal articleAcademic researchpeer-review

74 Citations (Scopus)

Abstract

Against the constraints in delivering sufficient houses, prefabrication as a sustainable solution for housing has been increasingly advocated for its potential merits of better quality, construction safety and cleaner built environment. However, schedule delay caused by various risks affected the prefabrication housing production (PHP) in Hong Kong. This problem can be further worsened when the manufacturing sector of PHP has entirely moved to offshore areas in the Pearl River Delta region. This study applies system dynamics to recognize and investigate the potential effect of various risks on the scheduling of prefabrication housing construction projects through the employment of Vensim software package. The simulation results show that schedule risks, namely low information interoperability between different enterprise resource planning systems (LIIBDERPS), logistics information inconsistency due to human errors probability (LIIHEP), Delay of delivery of precast element to site (DDPES), and Design information gap between designer and manufacturer (DIGDM) significantly contribute to the schedule delay in PHP. However, schedule is more sensitive toward LIIBDERPS than for the other three risks, indicating that LIIBDERPS should be monitored and given priority. The system dynamic model serves as an effective tool for quantitatively evaluating the effect of various risks on the schedule of PHP, offering valuable references for managers though comparing simulation results under different risk scenarios, so that potential risks that might lead to schedule delay could be identified and handled in advance.
Original languageEnglish
Pages (from-to)692-706
Number of pages15
JournalJournal of Cleaner Production
Volume153
DOIs
Publication statusPublished - 1 Jun 2017

Keywords

  • Hong Kong
  • Prefabrication housing production
  • Schedule risk management
  • System dynamcis

ASJC Scopus subject areas

  • Renewable Energy, Sustainability and the Environment
  • General Environmental Science
  • Strategy and Management
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Schedule risk modeling in prefabrication housing production'. Together they form a unique fingerprint.

Cite this