Keyphrases
Risk Assessment
100%
Operational Planning
100%
Risk Mitigation
100%
Area-level
100%
Rate of Change of Frequency (ROCOF)
100%
Inertia
42%
Risk Matrix
42%
Renewable Energy
28%
High Risk
14%
Monte Carlo
14%
Large-scale Power System
14%
Sensitivity Method
14%
Identification Method
14%
Frequency Fluctuation
14%
Frequency Response
14%
Uneven Distribution
14%
Safe Operation
14%
Fast Calculation
14%
Associated Risk
14%
Technical Feasibility
14%
Individual Cost
14%
Probabilistic Distribution
14%
Small Probability
14%
System Inertia
14%
Costs of Change
14%
Inertia Energy
14%
Grid Code
14%
Frequency Performance
14%
Scenario-based Simulation
14%
Inertia Identification
14%
Modern Power System
14%
Matrix-based
14%
Engineering
Operational Planning
100%
Change Rate
100%
Renewable Energy Source
28%
Power Engineering
28%
Safe Operation
14%
Technical Feasibility
14%
Individual Plant
14%
Frequency Response
14%