Skip to main navigation Skip to search Skip to main content

RandLA-Net-Assisted Scan-vs-BIM Framework with Adaptive Parameter Optimization for Construction Progress Monitoring

Research output: Journal article publication › Journal article › Academic research › peer-review

Abstract

Labor shortages in the construction industry have limited traditional manual progress monitoring, driving the demand for automated solutions. While many automated systems leverage the scan-vs-building information modeling (BIM) method, their robustness on complex construction sites remains a significant challenge. To address this, this study proposes a RandLA-Net-assisted framework with adaptive parameter optimization. The framework’s robustness is achieved through four key components: (1) a RandLA-Net-based clutter removal process for enhancing registration accuracy; (2) an oriented bounding box prealigned iterative closest point (OBBP-ICP) method for robust point cloud-to-BIM registration; (3) an adaptive coverage assessment (ACA) algorithm, which improves the resilience of element status recognition via an adaptive parameter; and (4) an integrated cost-level progress monitoring strategy. Validated on a live construction site in Hong Kong, the framework demonstrated an accuracy exceeding 99.23% in quantifying as-built concrete and curtain walls, with an average processing time of 47 min per scan. This framework significantly enhances the robustness and practicality of automated scan-vs-BIM progress monitoring.

Original languageEnglish
Article number04026034
JournalJournal of Computing in Civil Engineering
Volume40
Issue number4
DOIs
Publication statusPublished - 19 Mar 2026

Keywords

  • Automated construction progress monitoring
  • Point Cloud-to-BIM registration
  • RandLA-Net
  • Robustness
  • Scan-vs-building information modeling (BIM)

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Computer Science Applications

Fingerprint

Dive into the research topics of 'RandLA-Net-Assisted Scan-vs-BIM Framework with Adaptive Parameter Optimization for Construction Progress Monitoring'. Together they form a unique fingerprint.

Cite this