Skip to main navigation Skip to search Skip to main content

Probabilistic optimal design concerning uncertainties and on-site adaptive commissioning of air-conditioning water pump systems in buildings

    Research output: Journal article publication › Journal article › Academic research › peer-review

    Abstract

    As a result, significant energy is often wasted in operation due to oversizing to avoid the risk of being undersized. In current practice, throttling of commissioning valves are commonly adopted to push water flowrate (and pressure head) back to the design point no matter how much oversizing exists in a system. That partly mitigates the oversizing problem. This paper presents a novel approach consisting of probabilistic optimal design concerning uncertainties and on-site adaptive commissioning to further maximize energy savings of constant water flow pump systems. Minimized throttling is achieved by on-site adaptive commissioning, which reduces unnecessary pressure head and significant energy consumption. Pumps selected by the probabilistic optimal design can operate under both conventional design conditions and the projected possible off-design (oversized) conditions. The projection is based on the probability distribution of actual pressure head, which is estimated using Monte Carlo simulation by quantifying uncertainties in pressure loss calculation and system construction. Three case studies are conducted to test and validate this new design and commissioning approach. Results show that about 20% energy saving could be achieved, when the system is oversized by 20%, compared to conventional design and commissioning methods. The proposed approach also offers better energy performance in general compared to the designs all using variable speed pumps.
    Original languageEnglish
    Pages (from-to)53-65
    Number of pages13
    JournalApplied Energy
    Volume202
    DOIs
    Publication statusPublished - 1 Jan 2017

    UN SDGs

    This output contributes to the following UN Sustainable Development Goals (SDGs)

    1. SDG 7 - Affordable and Clean Energy
      SDG 7 Affordable and Clean Energy

    Keywords

    • Adaptive commissioning
    • Air-conditioning
    • Building energy saving
    • Probabilistic optimal design
    • Uncertainty analysis

    ASJC Scopus subject areas

    • Building and Construction
    • General Energy
    • Mechanical Engineering
    • Management, Monitoring, Policy and Law

    Fingerprint

    Dive into the research topics of 'Probabilistic optimal design concerning uncertainties and on-site adaptive commissioning of air-conditioning water pump systems in buildings'. Together they form a unique fingerprint.

    Cite this