Optimized acceleration of repetitive construction projects

Ibraim Bakry, Tarek Zayed, Osama Moselhi

Research output: Unpublished conference presentation (presented paper, abstract, poster)Conference presentation (not published in journal/proceeding/book)Academic researchpeer-review

1 Citation (Scopus)

Abstract

Purpose: The purpose of this paper is to present an improved algorithm for optimized acceleration of repetitive construction projects. Method: Through a set of iterative steps this algorithm identifies the least costly method that would put a project back on track, while maintaining crew work continuity. The algorithm divides each activity into segments and identifies the segments that would shorten project duration if accelerated. For these identified segments, the ones with the lowest cost slope are selected and cued for acceleration. Through the proposed segmentation of activities this algorithm provides better focusing of allocated additional resources, thus resulting in more cost-efficient acceleration plans. The algorithm is implemented in a spreadsheet application, which helps automate calculations, yet allows users to fine-tune the algorithm to fit the project conditions at hand. The algorithm allows users to select among different acceleration strategies such as working overtime, working double shifts, working weekends, employing more productive crews, work stoppage for converging activities and intentional work breaks. Results & Discussion: The developed algorithm is applied to a case study drawn from literature in order to illustrate its basic features and demonstrate its accuracy. The results obtained, when compared to those reported for the case considered, demonstrate the ability to accelerate this project in while utilising fewer resources.

Original languageEnglish
DOIs
Publication statusPublished - 2012
Event29th International Symposium of Automation and Robotics in Construction, ISARC 2012 - Eindhoven, Netherlands
Duration: 26 Jun 201229 Jun 2012

Conference

Conference29th International Symposium of Automation and Robotics in Construction, ISARC 2012
Country/TerritoryNetherlands
CityEindhoven
Period26/06/1229/06/12

Keywords

  • Acceleration
  • Linear scheduling
  • Management & social issues
  • Repetitive projects

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Modelling and Simulation