Abstract
We analyze the operational hedging and coordination problem in a prefabrication construction supply chain consisting of a building company (BC) and a prefab factory (PF). The interaction between two commonly used operational hedging methods is investigated. A mechanism for coordinating two independent entities (i.e. BC and PF) is developed. According to further numerical studies, we found that both parties get gets better-off and the system is less susceptible to a highly uncertain supply chain.
| Original language | English |
|---|---|
| Pages (from-to) | 1178-1183 |
| Number of pages | 6 |
| Journal | Procedia Manufacturing |
| Volume | 11 |
| DOIs | |
| Publication status | Published - 2017 |
| Externally published | Yes |
Keywords
- game theory
- operational hedging
- prefabrication construction
- supply chain coordination
- supply chain risk management
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering
- Artificial Intelligence
Fingerprint
Dive into the research topics of 'Operational Hedging and Coordination in Prefabrication Construction Industry'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver