Multi-Objective Optimization Model for Inspection Scheduling of Sewer Pipelines

Mohamed Elmasry, Tarek Zayed, Alaa Hawari

Research output: Journal article publicationJournal articleAcademic researchpeer-review

20 Citations (Scopus)

Abstract

Inspection activities play an important role in the operation and maintenance (O&M) strategy in municipalities. Efficient O&M strategies can help in making informed decisions based on the actual condition of pipelines collected from inspection activities. Municipalities are in dire need of optimizing inspection activities due to the competitive needs for the large number of deteriorated sewer pipelines and limited budget allocated for inspections. This paper presents an optimization model for inspection of deteriorated sewer pipelines using multiobjective optimization technique for which time, cost, and number of inspected sections are optimized using mixed integer linear programming (MILP). The general algebraic modeling system (GAMS) is used to reduce the computational complexity of the proposed optimization model. A case study for an existing sewage network in the city of Doha, Qatar, is used to demonstrate the capabilities of the optimization model. The results obtained from implementing the optimization model showed an enhancement of 25.7, 44.4, and 6.5% for time, cost, and number of sections inspected when compared with the results for the same model using the genetic algorithm (GA). Additionally, a cost-saving of 68% could be achieved if the proposed optimization model was deployed instead of the current inspection practices carried out by the municipalities in Doha, Qatar. It is expected that the proposed model could be used to reduce both the cost and time of inspection, especially in cases of limited budget and work forces.

Original languageEnglish
Article number04018129
JournalJournal of Construction Engineering and Management
Volume145
Issue number2
DOIs
Publication statusPublished - 1 Feb 2019

Keywords

  • Consequences of failure
  • Inspection scheduling
  • Likelihood of failure
  • Multiobjective optimization
  • Risk assessment
  • Wastewater pipelines

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Industrial relations
  • Strategy and Management

Fingerprint

Dive into the research topics of 'Multi-Objective Optimization Model for Inspection Scheduling of Sewer Pipelines'. Together they form a unique fingerprint.

Cite this