Skip to main navigation Skip to search Skip to main content

Minimizing setup time from mold-lifting crane in mold maintenance schedule

  • C.S. Wong
  • , Tung Sun Chan
  • , S.H. Chung
  • , B. Niu

Research output: Unpublished conference presentation (presented paper, abstract, poster)Conference presentation (not published in journal/proceeding/book)Academic researchpeer-review

Original languageEnglish
Pages739-747
Number of pages9
Publication statusPublished - 2013
EventInstitute of Industrial Engineers Asian Conference Conference [IIE Asian Conference] -
Duration: 1 Jan 2013 → …

Conference

ConferenceInstitute of Industrial Engineers Asian Conference Conference [IIE Asian Conference]
Period1/01/13 → …

Cite this