Keyphrases
High-rise Building
100%
Water Distribution Systems
100%
Pump-turbine
100%
Micro Hydro Power Generation
100%
Water Head
33%
Head Reduction
33%
Control Strategy
22%
Turbine Control
22%
Turbine Installation
22%
Hong Kong
11%
Working Conditions
11%
Electricity Generation
11%
Empirical Formula
11%
CFD Simulation
11%
Performance Prediction
11%
Equation-based
11%
Water Pressure
11%
Water pipelines
11%
High-speed Flow
11%
Power Generation
11%
Water Leakage
11%
Hydropower Generation
11%
Proportional Valve
11%
Hydraulic Test Bench
11%
Engineering
Power Generation
100%
Rise Building
100%
Water Supply Systems
100%
Micro-Hydro
100%
Turbine
100%
Control Strategy
22%
Computational Fluid Dynamics
11%
Experimental Result
11%
Hydraulics
11%
Flow Rate
11%
Simulated Result
11%
Measured Result
11%
Test Rig
11%
Hydroelectric Energy
11%
Excessive Water
11%
Pressure Reducing Valve
11%
Performance Prediction
11%
Electricity Generation
11%
Flow Velocity
11%