Abstract
This paper introduces a modeling framework for solving the joint optimization problem of airport slot allocation and gate assignment for an airport with capacity constraints, taking into account operational uncertainty (i.e., uncertain flight delays). Despite their interdependence, slot allocation and gate assignment problems are often treated in isolation. In this paper, we jointly consider slot allocation and gate assignment to improve efficiency and model the problem using a two-stage stochastic integer programming approach. The gate assignment problem is formulated as a real-time problem to reflect airport operations, with the uncertainty information is updated on a rolling basis as time progresses. To solve the model efficiently, we employ a Benders-based decomposition algorithm, combined with a rolling horizon approach and a tabu search heuristic for the subproblems (real-time problems). Numerical experiments are conducted in various realistic scenarios based on real historical flight data from Shanghai Hongqiao International Airport. The numerical results demonstrate that the proposed approach is highly effective in solving large-scale instances, indicating its potential applicability in airport scheduling and operations.
| Original language | English |
|---|---|
| Article number | 112284 |
| Journal | Computers and Industrial Engineering |
| Volume | 220 |
| DOIs | |
| Publication status | Published - Oct 2026 |
Keywords
- Airport slot scheduling
- Benders-based decomposition
- Gate assignment
- Rolling horizon
- Stochastic integer programming
- Tabu search
ASJC Scopus subject areas
- General Computer Science
- General Engineering
- Management Science and Operations Research
Fingerprint
Dive into the research topics of 'Joint optimization of airport slot allocation and gate assignment: A stochastic integer programming approach'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver