@inproceedings{c3c51cbe71ea4ae99823a003a328bc83,
title = "Job scheduling in a multi-layer vision system",
abstract = "We consider job scheduling in a multi-layer vision system. We model this problem as scheduling a number of jobs, which are made of multiprocessor tasks, with arbitrary processing times and arbitrary processor requirements in a two-layer system. Our objective is to minimize the makespan. We have developed several heuristic algorithms that include simple sequencing and scheduling rules. The computational experiments show that three of these heuristic algorithms are efficient.",
author = "Ercan, {M. Fikret} and Ceyda Oǧuz and Fung, {Yu Fai}",
year = "1999",
month = sep,
language = "English",
isbn = "3540664432",
series = "Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)",
pages = "317--321",
booktitle = "Euro-Par 1999 - Parallel Processing",
note = "5th International Conference on Parallel Processing, Euro-Par 1999 ; Conference date: 31-08-1999 Through 03-09-1999",
}