Integrated preventive maintenance improvement and spare part ordering strategy for age deterioration components

Danping Lin, Carman Lee, Wenyan Guo

Research output: Chapter in book / Conference proceedingConference article published in proceeding or bookAcademic researchpeer-review

2 Citations (Scopus)

Abstract

We consider the integrated preventive maintenance and spare part ordering strategy problem for age deterioration components in which there are distinguishing critical and non-critical components. The component deterioration process is modeled as a three-stage failure process in which multiple maintenance modes are conducted to restore the machines after periodical inspection. Some spare parts are stored based on historical repair records while certain spare parts are ordered alternatively whenever necessary. The influence of spare parts ordering associated with cost and fulfillment of maintenance mode. Our objective is to minimize the expected total cost per unit time. We formulated the model based on the renew theory and characterize the scenarios of combinations of maintenance mode selection and spare parts ordering strategy. Numerical experiments of a case study showed that the cost-saving obtained by integrated optimization of maintenance mode selection and spare parts ordering decisions are significant.

Original languageEnglish
Title of host publication2020 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2020
PublisherIEEE Computer Society
Pages1204-1209
Number of pages6
ISBN (Electronic)9781538672204
DOIs
Publication statusPublished - 14 Dec 2020
Event2020 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2020 - Virtual, Singapore, Singapore
Duration: 14 Dec 202017 Dec 2020

Publication series

NameIEEE International Conference on Industrial Engineering and Engineering Management
Volume2020-December
ISSN (Print)2157-3611
ISSN (Electronic)2157-362X

Conference

Conference2020 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2020
Country/TerritorySingapore
CityVirtual, Singapore
Period14/12/2017/12/20

Keywords

  • Critical component
  • Inspection
  • Preventive maintenance
  • Spare parts
  • The failure process

ASJC Scopus subject areas

  • Business, Management and Accounting (miscellaneous)
  • Industrial and Manufacturing Engineering
  • Safety, Risk, Reliability and Quality

Fingerprint

Dive into the research topics of 'Integrated preventive maintenance improvement and spare part ordering strategy for age deterioration components'. Together they form a unique fingerprint.

Cite this