Abstract
Design-builders play a vital role in the success of DB projects. In the construction market of the People's Republic of China, most of the design-builders, however, lack adequate competences to conduct the DB projects successfully. The objective of this study is, therefore, to identify the key competences that design-builders should possess to not only ensure the success of DB projects but also acquire the competitive advantages in the DB market. Five semi-structured face-to-face interviews and two rounds of Delphi questionnaire survey were conducted to identify the key competences of design-builders. Rankings have been assigned to these key competences on the basis of their relative importance. Six ranked key competences of design-builders have been identified, namely: (1) experience with similar DB projects; (2) capability of corporate management; (3) combination of building techniques and design expertise; (4) financial capability for DB projects; (5) enterprise qualification and scale; and (6) credit records and reputation in the industry. The design-builders can make use of the research findings as guidelines to improve their DB competence. These research findings will also be useful to clients during the selection of design-builders.
Original language | English |
---|---|
Pages (from-to) | 1141-1152 |
Number of pages | 12 |
Journal | Construction Management and Economics |
Volume | 27 |
Issue number | 11 |
DOIs | |
Publication status | Published - 1 Dec 2009 |
Keywords
- China
- Competence
- Competitive advantages
- Delphi method
- Design and build
- Procurement
ASJC Scopus subject areas
- Management Information Systems
- Building and Construction
- Industrial and Manufacturing Engineering