TY - GEN
T1 - Evaluation on expressway construction project management effectiveness based on G-AHP model
T2 - 2006 International Conference on Management Science and Engineering, ICMSE'06
AU - Zhang, Cai Jiang
AU - Wang, Chun Sheng
AU - Shen, Qi Ping Geoffrey
PY - 2006
Y1 - 2006
N2 - Many problems emerged from the expressway development in China. In order to appraise the expressway construction project management (EC-PM) effectiveness, in this paper, a Group decision Analytic Hierarchy Process (G-AHP) model is set up, which is based on AHP, and through group decision method to define its structure and to clear its parameters. Then apply the G-AHP model to the selected 7 expressway construction projects in Guangdong Province, south China as cases, and give out their concrete numerical effectiveness. This apprising has drawn the following three significant collusions: the first is that the EC-PM effectiveness in Guangdong expressway construction is wildly lower in the earlier time, the second is that almost all projects except Meihe , which have successfully conducted the Complex Value Management(CVM) into the management process, neglect the management on subjective elements, even on the objective management, such as quality control, cost control, time plan control, etc, are generally in lower effectiveness, other objectives such as ecological environment protection, local culture and touring resources utilizing are usually be omitted too, the third conclusion is that as a new EC-PM mode, the effectiveness of Meihe mode is the best, this shows that this mode has the promoting value.
AB - Many problems emerged from the expressway development in China. In order to appraise the expressway construction project management (EC-PM) effectiveness, in this paper, a Group decision Analytic Hierarchy Process (G-AHP) model is set up, which is based on AHP, and through group decision method to define its structure and to clear its parameters. Then apply the G-AHP model to the selected 7 expressway construction projects in Guangdong Province, south China as cases, and give out their concrete numerical effectiveness. This apprising has drawn the following three significant collusions: the first is that the EC-PM effectiveness in Guangdong expressway construction is wildly lower in the earlier time, the second is that almost all projects except Meihe , which have successfully conducted the Complex Value Management(CVM) into the management process, neglect the management on subjective elements, even on the objective management, such as quality control, cost control, time plan control, etc, are generally in lower effectiveness, other objectives such as ecological environment protection, local culture and touring resources utilizing are usually be omitted too, the third conclusion is that as a new EC-PM mode, the effectiveness of Meihe mode is the best, this shows that this mode has the promoting value.
KW - Complex value management (cvm)
KW - Effectiveness appraise
KW - Expressway construction project management (ec-pm)
KW - Group decisional analytic hierarchy process (G-AHP)
KW - Meihe mode subjective element
KW - Objective element
UR - http://www.scopus.com/inward/record.url?scp=43549088099&partnerID=8YFLogxK
U2 - 10.1109/ICMSE.2006.314133
DO - 10.1109/ICMSE.2006.314133
M3 - Conference article published in proceeding or book
AN - SCOPUS:43549088099
SN - 7560323553
SN - 9787560323558
T3 - Proceedings of 2006 International Conference on Management Science and Engineering, ICMSE'06 (13th)
SP - 2068
EP - 2074
BT - Proceedings of 2006 International Conference on Management Science and Engineering, ICMSE'06 (13th)
PB - Institute of Electrical and Electronics Engineers Inc.
Y2 - 5 October 2006 through 7 October 2006
ER -