Abstract
In this paper, two economic production quantity (EPQ) models are proposed for deteriorating/imperfect items with rework process. The production process is imperfect, and imperfect quality items are reworked to become serviceable. At the same time, the remaining good quality items may deteriorate. The inspection of deteriorated items is also imperfect, so that deteriorated items may be sold to customers, which will create negative impact on corporate image. In the first model, a single production-rework plant system is considered. The optimal production times and the economic production quantities are obtained analytically. In the second model, a system that consists of n production plants and one rework plant is considered. A solution procedure is developed in order to obtain the optimal operating cost. Numerical examples are provided to compare the performance of the two systems.
Original language | English |
---|---|
Pages (from-to) | 879-888 |
Number of pages | 10 |
Journal | Computers and Industrial Engineering |
Volume | 66 |
Issue number | 4 |
DOIs | |
Publication status | Published - Dec 2013 |
Keywords
- Deteriorating items
- Economic production quantity (EPQ)
- Imperfect quality
- Rework
- Shortages backordering
ASJC Scopus subject areas
- Computer Science(all)
- Engineering(all)