Dynamic scheduling for a flexible manufacturing system - the pre-emptive approach

Tung Sun Chan, H. K. Chan

Research output: Journal article publicationJournal articleAcademic researchpeer-review

28 Citations (Scopus)

Abstract

This paper presents a simulation model of a flexible manufacturing system (FMS) which minimises three performance criteria simultaneously, i.e. mean flow-time, mean tardiness, and mean earliness. The dispatching rule will be changed at a frequency that is varied by the quantity of output produced by the system. Therefore, the dynamic system is an event-trigger rather than triggered by changing the rule at regular time intervals, which is passive. Three indices are used to represent the three criteria being monitored, and the indices are ranked in descending order. The larger the index, the worse is the condition of the criterion in the system. An appropriate rule will be selected for the next operation in order to tackle that criterion with the largest index. This mechanism is called the pre-emptive method. Furthermore, the indices can be biased by the decision maker so that a particular criterion can have larger weighting. Results show that a solution (range of frequency) can always be obtained for changing the dispatching rule so that the system is better than one which just uses fixed FMS scheduling rules.
Original languageEnglish
Pages (from-to)760-768
Number of pages9
JournalInternational Journal of Advanced Manufacturing Technology
Volume17
Issue number10
DOIs
Publication statusPublished - 11 Oct 2001
Externally publishedYes

Keywords

  • Dispatching
  • Dynamic scheduling
  • Flexible manufacturing systems
  • Pre-emptive
  • Simulation

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Dynamic scheduling for a flexible manufacturing system - the pre-emptive approach'. Together they form a unique fingerprint.

Cite this