Keyphrases
Supply Chain
100%
Dynamic Change
100%
Formwork
100%
Discrete Event
100%
Concrete Formwork
100%
Construction Site
66%
Mathematical Model
22%
Cost Savings
22%
Dynamic Process
22%
Agent-based Model
22%
Waste Reduction
11%
Waste Disposal
11%
Simulation Modeling
11%
Optimal Strategy
11%
Negotiation Protocol
11%
Potential Reuse
11%
Asymmetric Information
11%
Agent Behavior
11%
Agent-based Modeling
11%
Agent-based Simulation
11%
Material Waste
11%
Reuse Value
11%
Value Reduction
11%
Decision Agent
11%
Cost of Concrete
11%
Concrete Component
11%
Engineering
Construction Site
100%
Dynamic Process
33%
Mathematical Model
33%
Agent-Based Modeling
16%
Supporting System
16%
Concrete Component
16%