Abstract
This paper is addressed to the problem of reducing missed due-date and job flow-time in job shop scheduling by combining the job sequencing decision with the due-date assignment policy. A 'semi-local' due-date-oriented sequencing rule is designed to monitor the progress of jobs in the shop to meet their assigned due-dates. The performance of the sequencing rule is further enhanced with the implementation of a 'rational' method of due-date assignment which incorporates both job content and shop status information into its process of determining due-dates. Simulation results of actual shop data showing that the combined scheduling procedure performs better than some other simple sequencing rules with the TWK due-date assignment method are presented and discussed.
Original language | English |
---|---|
Title of host publication | [No Source Information Available] |
Publisher | Elsevier Science Publ BV |
Pages | 363-375 |
Number of pages | 13 |
ISBN (Print) | 0444868275 |
Publication status | Published - 1 Dec 1984 |
Externally published | Yes |
Event | Advances in Production Management Systems: Production Management Systems in the Eighties, Proceedings of the IFIP WG 5. 7 Working Conference on Advances in Production Management Systems - APMS '82'. - Bordeaux, France Duration: 1 Dec 1984 → … |
Conference
Conference | Advances in Production Management Systems: Production Management Systems in the Eighties, Proceedings of the IFIP WG 5. 7 Working Conference on Advances in Production Management Systems - APMS '82'. |
---|---|
Country | France |
City | Bordeaux |
Period | 1/12/84 → … |
ASJC Scopus subject areas
- Engineering(all)