Abstract
We consider bicriterion scheduling of equal-length jobs on uniform parallel machines to minimize total tardiness and number of tardy jobs. The Pareto-scheduling problem is studied in this paper, which includes the hierarchical-scheduling problem as a subversion. By using the single-machine scheduling with generated completion times model introduced by Zhao and Yuan (J Comb Optim 39:637–661, 2020), we present an -time algorithm to solve the Pareto-scheduling problem, and two -time algorithms to solve two hierarchical-scheduling problems, respectively. Our -time algorithms improve the -time algorithms given by Sarin and Prakash (J Comb Optim 8:227–240, 2004) to solve two hierarchical-scheduling problems on identical parallel machines.
| Original language | English |
|---|---|
| Article number | 24 |
| Journal | Journal of Combinatorial Optimization |
| Volume | 50 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - Oct 2025 |
Keywords
- Bicriterion scheduling
- Equal-length jobs
- Number of tardy jobs
- Total tardiness
- Uniform parallel machines
ASJC Scopus subject areas
- Computer Science Applications
- Discrete Mathematics and Combinatorics
- Control and Optimization
- Computational Theory and Mathematics
- Applied Mathematics
Fingerprint
Dive into the research topics of 'Bicriterion parallel-machine scheduling of equal-length jobs to minimize total tardiness and number of tardy jobs'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver