Abstract
Construction schedules and site space arrangement are essential to project management, as they directly influence security, machine running, material deployment, power distribution as well as construction progress and cost. There has been a strong need for more effective planning and management of site space and facilities. This paper introduces a 4D Integrated Site Planning System (4D-ISPS) which integrates schedules, 3D models, resources and site spaces together with 4D CAD technology to provide 4D graphical visualization capability for construction site planning. The features of 4D-ISPS are described in detail. The implementation techniques of this system are also discussed and a real life case is presented.
Original language | English |
---|---|
Pages (from-to) | 369-381 |
Number of pages | 13 |
Journal | Automation in Construction |
Volume | 14 |
Issue number | 3 |
DOIs | |
Publication status | Published - 1 Jun 2005 |
Keywords
- 3D Model
- 4D CAD
- Construction management
- Site layout
ASJC Scopus subject areas
- Control and Systems Engineering
- Civil and Structural Engineering
- Building and Construction