N2 - Production service system (PnSS) is a new business mode where a manufacturer obtains manufacturing resources in the form of continuous production services instead of resource entities. This new mode helps reduce the setup costs and technical/financial risks of production resources while ensuring their life cycle service levels. Industrial product service system advocates the servitisation of production facilities and has evolved into a successful and mature type of PnSS. This article proposes a PnSS framework that expands the scope of production services to include component services, i.e. suppliers provide not only the component entities but also a series of services related to the components' stocking, assembling and even consuming, to their customers along the supply chain. A systematic PnSS configuration (PnSSC) methodology and the enabling platform are developed based on a newly extended analytical target cascading (ATC) method. As ATC accommodates heterogeneous sub-system integration and multi-level problem solving, the methodologies are able to address the typical challenges that a practical component service PnSSC process normally faces, such as distributed decision rights, uncertain decision structure and short decision period. Due to the similar and normally simplified configuration requirements, this methodology and platform are also both generic enough to be applied or adapted for PnSS of other production resources.
AB - Production service system (PnSS) is a new business mode where a manufacturer obtains manufacturing resources in the form of continuous production services instead of resource entities. This new mode helps reduce the setup costs and technical/financial risks of production resources while ensuring their life cycle service levels. Industrial product service system advocates the servitisation of production facilities and has evolved into a successful and mature type of PnSS. This article proposes a PnSS framework that expands the scope of production services to include component services, i.e. suppliers provide not only the component entities but also a series of services related to the components' stocking, assembling and even consuming, to their customers along the supply chain. A systematic PnSS configuration (PnSSC) methodology and the enabling platform are developed based on a newly extended analytical target cascading (ATC) method. As ATC accommodates heterogeneous sub-system integration and multi-level problem solving, the methodologies are able to address the typical challenges that a practical component service PnSSC process normally faces, such as distributed decision rights, uncertain decision structure and short decision period. Due to the similar and normally simplified configuration requirements, this methodology and platform are also both generic enough to be applied or adapted for PnSS of other production resources.
KW - analytical target cascading
KW - collaborative production
KW - manufacturing alliance
KW - product service system
KW - service oriented architecture (SOA)
UR - http://www.scopus.com/inward/record.url?scp=79957532381&partnerID=8YFLogxK
U2 - 10.1080/0951192X.2010.551282
DO - 10.1080/0951192X.2010.551282
M3 - Journal article
AN - SCOPUS:79957532381
SN - 0951-192X
VL - 24
SP - 457
EP - 470
JO - International Journal of Computer Integrated Manufacturing
JF - International Journal of Computer Integrated Manufacturing
IS - 5
ER -