Abstract
An efficient two-stage heuristic approach is developed for solving the fleet management problem under time-varying demand. Stage 1 of the approach optimizes the vehicles’ utilization schedule. Continuous-time approximation is employed to yield a set of near-optimality conditions that can greatly reduce the solution space of this stage. Stage 2 then optimizes the vehicle purchase and retirement schedules. Numerical experiments showed that our approach outperformed a number of previous methods and commercial solvers by large margins in terms of solution quality, computational efficiency, or both.
| Original language | English |
|---|---|
| Article number | 102268 |
| Journal | Transportation Research Part E: Logistics and Transportation Review |
| Volume | 147 |
| DOIs | |
| Publication status | Published - Mar 2021 |
Keywords
- Continuous-time approximation
- First-order condition
- Time-varying demand
- Two-stage optimization
- Vehicle fleet management
ASJC Scopus subject areas
- Business and International Management
- Civil and Structural Engineering
- Transportation
Fingerprint
Dive into the research topics of 'A two-stage heuristic approach for fleet management optimization under time-varying demand'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver