Abstract
We consider the completion time variance problem. Our main result is a tight lower bound for the mean completion time of an optimal sequence. This result can be applied to reduce the time required to solve the problem.
Original language | English |
---|---|
Pages (from-to) | 211-213 |
Number of pages | 3 |
Journal | European Journal of Operational Research |
Volume | 92 |
Issue number | 1 |
DOIs | |
Publication status | Published - 5 Jul 1996 |
ASJC Scopus subject areas
- Modelling and Simulation
- Management Science and Operations Research
- Information Systems and Management