Abstract
A model to optimize the planning of the chemical integrated system comprised by multi-devices and multi-products has been proposed in this paper. With the objective to make more profi ts, the traditional model for optimizing production planning has been proposed. The price of chemicals, the market demand, and the production capacity have been considered as mutative variables, then an improved model in which some parameters are not constant has been developed and a new method to solve the grey linear programming has been proposed. In the grey programming model, the value of credibility can be suggested by the decision-makers, and the results of the production planning calculated by the model can help them to achieve their desired target. An actual case has been studied by the proposed methodology, and the proposed methodology can be popularized to other cases.
Original language | English |
---|---|
Pages (from-to) | 16-22 |
Number of pages | 7 |
Journal | Polish Journal of Chemical Technology |
Volume | 15 |
Issue number | 2 |
DOIs | |
Publication status | Published - 1 Jun 2013 |
Externally published | Yes |
Keywords
- Chemical integrated system
- Grey programming
- Planning
ASJC Scopus subject areas
- Biotechnology
- General Chemistry
- General Chemical Engineering