Abstract
A result in a recent paper reported by Zhang et al. (Int J Adv Manuf Technol 57:1175-1181) is incorrect because job processing times are variable due to both deteriorating jobs and learning effects, which is not taken into account by the authors. In this note, we show by a counter-example that the published result is incorrect and provide the corrected result.
Original language | English |
---|---|
Pages (from-to) | 689-693 |
Number of pages | 5 |
Journal | International Journal of Advanced Manufacturing Technology |
Volume | 65 |
Issue number | 5-8 |
DOIs | |
Publication status | Published - 1 Mar 2013 |
Keywords
- Deteriorating jobs
- Learning effect
- Resource allocation
- Scheduling
- Single machine
ASJC Scopus subject areas
- Control and Systems Engineering
- Software
- Mechanical Engineering
- Computer Science Applications
- Industrial and Manufacturing Engineering