A Metric Approach for the Two-Station Single-Track Railway Scheduling Problem

T. C. Edwin Cheng, Alexander Lazarev, Darya Lemtyuzhnikova

Research output: Journal article publicationConference articleAcademic researchpeer-review

4 Citations (Scopus)

Abstract

We consider the instance space metric method to the two-station single-track railway scheduling problem. This method has been effectively applied to several classical NP-hard scheduling problems, but was not tested on some actual railway scheduling models. It allows to construct the solutions with absolute error in polynomial time if there are some polynomially solvable instance subclasses for the initial NP-hard problem. Considering the metrics for the problem parameters space, we develop an innovative approach to solve the particular problem in polynomial time with absolute error and make some numerical tests.

Original languageEnglish
Pages (from-to)2875-2880
Number of pages6
JournalIFAC-PapersOnLine
Volume55
Issue number10
DOIs
Publication statusPublished - 2022
Event10th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2022 - Nantes, France
Duration: 22 Jun 202224 Jun 2022

Keywords

  • maximum lateness
  • metric approach
  • optimization
  • railway planing
  • scheduling

ASJC Scopus subject areas

  • Control and Systems Engineering

Fingerprint

Dive into the research topics of 'A Metric Approach for the Two-Station Single-Track Railway Scheduling Problem'. Together they form a unique fingerprint.

Cite this