Abstract
This article aims to identify and analyze the key benefits of adopting Guaranteed Maximum Price and Target Cost Contracts (GMP/TCC) over and above the traditional lump-sum contractual arrangement through an empirical questionnaire survey conducted in South Australia and compared with the findings in Hong Kong. The Mann-Whitney U Test indicated differences in perception between the two groups of respondents on the majority of the identified benefits. The study has provided an in-depth understanding of the perceived benefits of the GMP/TCC scheme, hence leading to a wider application of those alternative integrated procurement strategies in both regions for reference by the construction community at large.
| Original language | English |
|---|---|
| Pages (from-to) | 4-20 |
| Number of pages | 17 |
| Journal | Project Management Journal |
| Volume | 43 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - 1 Apr 2012 |
Keywords
- benefits
- guaranteed maximum price
- Hong Kong
- South Australia
- target cost contracting
ASJC Scopus subject areas
- Business and International Management
- Strategy and Management
- Management of Technology and Innovation
Fingerprint
Dive into the research topics of 'A comparative study of the benefits of applying target cost contracts between South Australia and Hong Kong'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver