Abstract
The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Realtime Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar stem f
Original language | English |
---|---|
Pages (from-to) | 23-32 |
Number of pages | 10 |
Journal | Journal of Applied Geodesy |
Volume | 4 |
Issue number | 1 |
DOIs | |
Publication status | Published - 1 Jan 2010 |
Keywords
- GPS
- resources management
- Ultra Wide Band
ASJC Scopus subject areas
- Modelling and Simulation
- Engineering (miscellaneous)
- Earth and Planetary Sciences (miscellaneous)