水平排水板真空脱水-固化联合方法处理疏浚淤泥的试验研究

Translated title of the contribution: Experimental investigation on prefabricated horizontal drain-based vacuum dewatering-solidification combined method for treatment of dredged slurry

Dingbao Song, Hefu Pu, Chunxue Zhang, Zhanyi Li, Jinwei Qiu, Wenbo Chen

Research output: Journal article publicationJournal articleAcademic researchpeer-review

2 Citations (Scopus)

Abstract

The dredged slurry exhibits the characteristics of high water content, low permeability, high compressibility and low or negligible bearing capacity, and is difficult to be rapidly treated and disposed of. Aiming at this problem, a composite method, i.e., the combined method of prefabricated horizontal drain-based vacuum dewatering and solidification, abbreviated as PHDVDS, is introduced, and a series of model tests are carried out to investigate the volume reduction and reinforcement effects of the PHDVDS method, with lime-activated ground blast furnace slag (GGBS) and cement as the binder, respectively. The performance of PHDVDS method is compared with that of the pure vacuum dewatering method (no binder) and the pure solidification method (no vacuum dewatering, using cement as the binder). During the vacuum dewatering stage of the model tests, the mass of discharged water and the settlement, i.e., volume reduction, are monitored, after which the unconfined compressive strength (UCS) of soil samples at different curing ages is tested, and the development of UCS is analyzed from microstructural point of view by the X-ray diffraction (XRD), scanning electron microscopy (SEM) and mercury intrusion porosimetry (MIP). The results indicate that, compared with the pure vacuum dewatering method and pure solidification method, the PHDVDS method demonstrates significantly better volume reduction efficacy and significantly better reinforcement efficacy. For instance, the volume reduction by the PHDVDS method after two-day vacuum dewatering is 7%~43%, higher than that by the pure vacuum dewatering method. The 60-day UCS of the PHDVDS-treated soil is 6 times~54 times higher than that of the pure solidification method.

Translated title of the contributionExperimental investigation on prefabricated horizontal drain-based vacuum dewatering-solidification combined method for treatment of dredged slurry
Original languageChinese (Simplified)
Pages (from-to)1897-1906
Number of pages10
JournalYantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering
Volume45
Issue number9
DOIs
Publication statusPublished - Sept 2023

Keywords

  • dredged slurry
  • high water content
  • model test
  • prefabricated horizontal drain
  • solidification
  • vacuum dewatering

ASJC Scopus subject areas

  • Geotechnical Engineering and Engineering Geology

Fingerprint